Renkara Offices - 2015 Retrospective
As 2015 winds down, I wanted to look back on this project and see what went well, what didn't, and what is still left to do.
As 2015 winds down, I wanted to look back on this project and see what went well, what didn't, and what is still left to do.
In Texas, one of the most important aspects of construction is planning for heating and cooling of the space. Also important, especially in a small office, is how much noise is made while heating and cooling the office.
Applying the concrete overlay was the last major piece of work to be done on the office project. Unlike stamping and staining, overlay has a different texture and allows precise matching of existing patterns.
After the retaining walls were finished and all of the stone was put up on the office walls and breezeway, there was still a lot of stone left, approximately 3 tons in total.