Skip to main content
AI14 August 2026

Coding and infrastructure

30 tasks. August 14, 2026 closed at 17.3x aggregate execution leverage across 729.5 qualified-senior-equivalent hours in 2,531 agent-session minutes. Covered operator leverage was 293.8x.

That is 18.2 qualified-senior-equivalent weeks. Task factors ranged from 4.0x to 42.4x. The largest project grouping contained 17 entries.

Task Log

#TaskSenior Est.Agent SessionOperatorFactor
1I3 English+Languages Waves 1-2: 3 ADRs + canon/trademarks, catalog 57->72 with skill axis, 11 language schemas + ContentProfile threading, Spanish/English template corpora (373 leaves), 10 [content…120.0h170m3m42.4x
2Documentation88.0h145m4m36.4x
3Debugging32.0h55m4m34.9x
4Progression hero fleet: authored 68 content-specific cinematic scene prompts, built reusable FLUX 1.1-pro renderer tool, generated + deployed photorealistic heroes for every page (steampunk plates retired),…14.0h25m3m33.6x
5Progression site: Analytics nav consolidation + /analytics/ page, tree pin/freeze + keystone highlighting, WCAG 2.2 AA remediation of all 9 audit findings (320px reflow, contrast tokens, atlas text…20.0h36m6m33.3x
6Progression appendix overhaul + section-paged reader: deleted appendices B/C + risk matrix, relettered A-G, linked all 63 reading/resource items, authored 404 company descriptions, deep-linked 825 chapter…30.0h55m8m32.7x
7Progression Tree + publishing: authored 80-node/102-edge advance dependency DAG with build-time validation and layered layout, /tree/ SVG renderer (ancestry/unlock lighting, chapter links, nav+icon); book…26.0h50m4m31.2x
8Progression ch4 prototype: photorealistic content-specific hero via Replicate FLUX, Path Forward rendered as brass-spine era timeline (generic transform, 9 chapters), Notable Players relocated pre-endnotes…18.0h45m6m24.0x
9Progression staleness + typography round: ch4 Notable Players rewritten as 34 individual current-to-2026 cards (GLP-1 cardio, amyloid antibodies, liquid biopsy, new AI Drug Discovery section), 7 new players…20.0h50m6m24.0x
10Progression book press round: print/ebook structure parity with the site (players pre-endnotes, plain endnote heads), small-type endnotes in both formats, elegant LaTeX design (letterspaced chapter openings,…14.0h40m4m21.0x
11Progression ledger rework: retired reader-entered predictions; /ledger/ now a curated register of all 538 auto-extracted forecasts with stable ids + hand-maintained achievement overlay (the single post-launch…12.0h35m5m20.6x
12[product] iOS Ship Program P0+P1: environment/baseline gate (suite 1065/1065, board zero-drift reconcile, stale card closed) then killed the entityId "current" sentinel across 23 call sites in 14 files behind…18.0h53m10m20.4x
13Progression cards follow-through: description absorption for blank-line entries (53 stranded blurbs -> 0), registry sweep to 355 companies/50 aliases incl. defunct-player support (395 cards), and a prose…12.0h40m5m18.0x
14Coding14.0h48m8m17.5x
15Deployment30.0h105m4m17.1x
16Deployment9.0h36m6m15.0x
17iOS Ship Program planning (/fable-planner): resumed pause file, mapped 60-card iOS board + prior parity program (E8/WP-4.1/WP-6.5 archaeology), verified 2026 App Store rules, authored 14-phase plan + durable…10.0h41m2m14.8x
18Deployment36.0h163m6m13.3x
19charlessieg.com mobile overflow diagnosis and fix (4 distinct causes), 12 UI changes, production promotion, removal of 11 stale prod objects incl. 2 unpublished drafts serving a staging preview gate26.0h118m10m13.2x
20I2-5b: argument_map_builder de-GED gating/config + Answer-Choice Elimination Trainer full build across 5 repos (agent-built, orchestrator-supervised)28.0h138m2m12.2x
21Deployment8.0h43m2m11.2x
22Fixed the real cause of stray timeline year markers (entry dates used the standalone-marker class); Career tab first; [product] AI linked4.0h22m4m10.9x
23August program resume day: 10-day-gap reconciliation, august→main merges across 8 repos with suite verification, plan Rev 2.2 + tracker/ledger reconciliation, ExamAttemptRow nullable migration (4-gate saga…26.0h146m3m10.7x
24Deployment14.0h79m2m10.6x
25Deployment48.0h288m8m10.0x
26Deployment10.0h62m3m9.7x
27Fixed 2 fleet process defects (worktree catalog-path resolution + merge commits bypassing the test gate) with mutation-verified regression tests and a 27-repo hook rollout; reviewed and merged a 1,227-line…20.0h149m5m8.1x
28Audit and review5.0h40m2m7.5x
29Progression fix round: referenced-by grid collapse for unnumbered chapters, keyboard-only section focus ring, endnote popup tick aimed at reference number on narrow viewports; headless-verified and deployed…1.5h14m2m6.4x
30Flight Plans session 2026-08-13/14: four owner-directed fixes, app.[product].ai Route53 go-live, session self-audit, 11-stage [ip-cluster] consolidation replan16.0h240m12m4.0x

Aggregate Statistics

MetricValue
Total tasks30
Qualified-senior-equivalent hours729.5
Agent-session minutes2,531
Covered operator minutes149
Recorded tokens22,383,600
Aggregate execution leverage17.3x
Covered operator leverage293.8x

Interpretation

The qualified-senior hours are counterfactual estimates and inherit that uncertainty. Execution, token, and operator-time values retain their recorded provenance, which is incomplete for some legacy rows. Summed agent-session minutes are not serial wall-clock time when sessions overlap.

This is one unusually experienced operator's record under unusual working conditions, not a general benchmark. The complete reconciled snapshot is available for download.