30 tasks. August 14, 2026 closed at 17.3x aggregate execution leverage across 729.5 qualified-senior-equivalent hours in 2,531 agent-session minutes. Covered operator leverage was 293.8x.
That is 18.2 qualified-senior-equivalent weeks. Task factors ranged from 4.0x to 42.4x. The largest project grouping contained 17 entries.
Task Log
| # | Task | Senior Est. | Agent Session | Operator | Factor |
|---|---|---|---|---|---|
| 1 | I3 English+Languages Waves 1-2: 3 ADRs + canon/trademarks, catalog 57->72 with skill axis, 11 language schemas + ContentProfile threading, Spanish/English template corpora (373 leaves), 10 [content… | 120.0h | 170m | 3m | 42.4x |
| 2 | Documentation | 88.0h | 145m | 4m | 36.4x |
| 3 | Debugging | 32.0h | 55m | 4m | 34.9x |
| 4 | Progression hero fleet: authored 68 content-specific cinematic scene prompts, built reusable FLUX 1.1-pro renderer tool, generated + deployed photorealistic heroes for every page (steampunk plates retired),… | 14.0h | 25m | 3m | 33.6x |
| 5 | Progression site: Analytics nav consolidation + /analytics/ page, tree pin/freeze + keystone highlighting, WCAG 2.2 AA remediation of all 9 audit findings (320px reflow, contrast tokens, atlas text… | 20.0h | 36m | 6m | 33.3x |
| 6 | Progression appendix overhaul + section-paged reader: deleted appendices B/C + risk matrix, relettered A-G, linked all 63 reading/resource items, authored 404 company descriptions, deep-linked 825 chapter… | 30.0h | 55m | 8m | 32.7x |
| 7 | Progression Tree + publishing: authored 80-node/102-edge advance dependency DAG with build-time validation and layered layout, /tree/ SVG renderer (ancestry/unlock lighting, chapter links, nav+icon); book… | 26.0h | 50m | 4m | 31.2x |
| 8 | Progression ch4 prototype: photorealistic content-specific hero via Replicate FLUX, Path Forward rendered as brass-spine era timeline (generic transform, 9 chapters), Notable Players relocated pre-endnotes… | 18.0h | 45m | 6m | 24.0x |
| 9 | Progression staleness + typography round: ch4 Notable Players rewritten as 34 individual current-to-2026 cards (GLP-1 cardio, amyloid antibodies, liquid biopsy, new AI Drug Discovery section), 7 new players… | 20.0h | 50m | 6m | 24.0x |
| 10 | Progression book press round: print/ebook structure parity with the site (players pre-endnotes, plain endnote heads), small-type endnotes in both formats, elegant LaTeX design (letterspaced chapter openings,… | 14.0h | 40m | 4m | 21.0x |
| 11 | Progression ledger rework: retired reader-entered predictions; /ledger/ now a curated register of all 538 auto-extracted forecasts with stable ids + hand-maintained achievement overlay (the single post-launch… | 12.0h | 35m | 5m | 20.6x |
| 12 | [product] iOS Ship Program P0+P1: environment/baseline gate (suite 1065/1065, board zero-drift reconcile, stale card closed) then killed the entityId "current" sentinel across 23 call sites in 14 files behind… | 18.0h | 53m | 10m | 20.4x |
| 13 | Progression cards follow-through: description absorption for blank-line entries (53 stranded blurbs -> 0), registry sweep to 355 companies/50 aliases incl. defunct-player support (395 cards), and a prose… | 12.0h | 40m | 5m | 18.0x |
| 14 | Coding | 14.0h | 48m | 8m | 17.5x |
| 15 | Deployment | 30.0h | 105m | 4m | 17.1x |
| 16 | Deployment | 9.0h | 36m | 6m | 15.0x |
| 17 | iOS Ship Program planning (/fable-planner): resumed pause file, mapped 60-card iOS board + prior parity program (E8/WP-4.1/WP-6.5 archaeology), verified 2026 App Store rules, authored 14-phase plan + durable… | 10.0h | 41m | 2m | 14.8x |
| 18 | Deployment | 36.0h | 163m | 6m | 13.3x |
| 19 | charlessieg.com mobile overflow diagnosis and fix (4 distinct causes), 12 UI changes, production promotion, removal of 11 stale prod objects incl. 2 unpublished drafts serving a staging preview gate | 26.0h | 118m | 10m | 13.2x |
| 20 | I2-5b: argument_map_builder de-GED gating/config + Answer-Choice Elimination Trainer full build across 5 repos (agent-built, orchestrator-supervised) | 28.0h | 138m | 2m | 12.2x |
| 21 | Deployment | 8.0h | 43m | 2m | 11.2x |
| 22 | Fixed the real cause of stray timeline year markers (entry dates used the standalone-marker class); Career tab first; [product] AI linked | 4.0h | 22m | 4m | 10.9x |
| 23 | August program resume day: 10-day-gap reconciliation, august→main merges across 8 repos with suite verification, plan Rev 2.2 + tracker/ledger reconciliation, ExamAttemptRow nullable migration (4-gate saga… | 26.0h | 146m | 3m | 10.7x |
| 24 | Deployment | 14.0h | 79m | 2m | 10.6x |
| 25 | Deployment | 48.0h | 288m | 8m | 10.0x |
| 26 | Deployment | 10.0h | 62m | 3m | 9.7x |
| 27 | Fixed 2 fleet process defects (worktree catalog-path resolution + merge commits bypassing the test gate) with mutation-verified regression tests and a 27-repo hook rollout; reviewed and merged a 1,227-line… | 20.0h | 149m | 5m | 8.1x |
| 28 | Audit and review | 5.0h | 40m | 2m | 7.5x |
| 29 | Progression fix round: referenced-by grid collapse for unnumbered chapters, keyboard-only section focus ring, endnote popup tick aimed at reference number on narrow viewports; headless-verified and deployed… | 1.5h | 14m | 2m | 6.4x |
| 30 | Flight Plans session 2026-08-13/14: four owner-directed fixes, app.[product].ai Route53 go-live, session self-audit, 11-stage [ip-cluster] consolidation replan | 16.0h | 240m | 12m | 4.0x |
Aggregate Statistics
| Metric | Value |
|---|---|
| Total tasks | 30 |
| Qualified-senior-equivalent hours | 729.5 |
| Agent-session minutes | 2,531 |
| Covered operator minutes | 149 |
| Recorded tokens | 22,383,600 |
| Aggregate execution leverage | 17.3x |
| Covered operator leverage | 293.8x |
Interpretation
The qualified-senior hours are counterfactual estimates and inherit that uncertainty. Execution, token, and operator-time values retain their recorded provenance, which is incomplete for some legacy rows. Summed agent-session minutes are not serial wall-clock time when sessions overlap.
This is one unusually experienced operator's record under unusual working conditions, not a general benchmark. The complete reconciled snapshot is available for download.