Skip to main content
Time Record 1 MIN READ MAR 19, 2026

Leverage Record: March 19, 2026

A light day. Six tasks, mostly cross-platform feature syncing and domain specification writing. The last day of spring break, wrapping up loose ends before heading home.

A light day. Six tasks, mostly cross-platform feature syncing and domain specification writing. The last day of spring break, wrapping up loose ends before heading home.

About These Records
These time records capture personal project work done with Claude Code (Anthropic) only. They do not include work done with ChatGPT (OpenAI), Gemini (Google), Grok (xAI), or other models, all of which I use extensively. Client work is also excluded, despite being primarily Claude Code. The actual total AI-assisted output for any given day is substantially higher than what appears here.

Task Log

#TaskHuman Est.ClaudeWeeksFactorSup. Factor
1Cross-platform sync: electron endpoints + study plan polish + iOS dashboard + daily rings + 6 coding domain specs40h30m1.0w80.0x480.0x
2Create 6 coding domain specs (Python, JS/TS, DSA, SQL, Git, Linux) + update domain catalog16h15m0.40w64.0x192.0x
3Sync engine endpoints + study plan polish from web to electron16h25m0.40w38.4x192.0x
4iOS dashboard 3-section redesign + daily rings persistence6h15m0.15w24.0x120.0x
5Create image generation prompts for 16 characters + 2 locations + 3 book covers3h8m0.075w22.5x60.0x
6Create novel landing site spec + company cross-references + spoiler stripping4h12m0.10w20.0x48.0x

Aggregate Stats

MetricValue
Total tasks6
Human-equivalent hours85h (10.6 working days)
Claude wall-clock time105m (1.8h)
Supervisory time26m
Tokens consumed~867,500
Weighted avg leverage factor48.6x
Weighted avg supervisory factor196.2x

Analysis

The cross-platform sync task at 80x carried most of the weight. Porting features from the web client to electron and iOS, writing 6 coding domain specs, and wiring up daily activity rings across all three platforms in a single 30-minute session. A developer would spend a full work week on that scope.

The novel-related tasks were pre-production work: generating detailed image prompts for character illustrations and book covers, and writing the specification for the novel's landing site with cross-references to the fictional company websites. Lower leverage (20-22x) because these are creative specification tasks that require more judgment than mechanical output.

This is the 25th day of leverage tracking. Twenty-six minutes of supervisory effort produced ten and a half days of engineering output on a wind-down day.