Posts
Renkara Offices - 2015 Retrospective
As 2015 winds down, I wanted to look back on this project and see what went well, what didn’t, and what is still left to do.
What Didn’t Go Well Project Schedule. Window Selection. Door Selection and Sizing. Air Conditioning Unit. Interior Painting. Exterior Stone. What Went Well Structure Height and Location. Retaining Walls. Ledgestone. Concrete Overlay. Final Air Conditioner. Data Lines. Lighting. DropShades. What’s Left to Do Window Shades.